Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Botou Yijia Metal Products Co

C-beam, U-beam, Z-beam, cold-formed steel, photovoltaic bracket, steel-clad w...

sell
  • There is no classification
contact
  • Contact:高女士
  • Phone:0317-8366872
  • Email:1171093921@qq.com
  • fax:0317-8366873
search
 
link
  • There is no link yet
home > sell > Supply Jiangsu steel wood square steel wood keel manufacturer 18132292622
Supply Jiangsu steel wood square steel wood keel manufacturer 18132292622
products: Views:12Supply Jiangsu steel wood square steel wood keel manufacturer 18132292622 
brand: 毅伽
规格: 齐全
price: 3000.00元/吨
MOQ: 2 吨
Total supply: 10000 吨
Delivery date: Shipped within 7 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-06-06 10:26
 
Details
The secondary rails of the wall formwork in the new assembled formwork are made of steel and wood-containing products
and adopt a thin-walled steel structure, which is high in strength and light in weight. It is used as the vertical ribs of the formwork and directly contacts the formwork. After the installation of the vertical wall formwork board is completed, it can be arranged vertically and in parallel at a certain distance. It plays the role of
template support skeleton. Suitable for wall column top plates instead of wooden
squares. In traditional construction technology, the secondary corrugation in the building formwork support system is a wooden structure. First of all, because it is a fixed-size product
, it is not designed to be modular according to the building. The building elevations are various
, so it needs to be cut off during the construction process. This cutting process
br/> It will inevitably cause waste. And the wood can only be cut shorter and shorter. Secondly, because the traditional process is a combination of wooden squares and steel pipes, the strength of the materials is different, which may cause mold running problems due to the deformation of the wooden squares. Thirdly, since concrete pouring is a wet process, the wood will be damp
and deformed. As the number of uses increases, the deformation will become greater, resulting in
during the construction process. As the floors increase, the construction quality becomes worse and worse
. The secondary rails of the wall formwork in the new assembled formwork are made of steel products, and are produced in the form of thin-walled steel-clad wood using steel-clad wood equipment.
They are strong and light in weight. It achieves the effect of using wooden cubes and increases
its strength. Used as the vertical columns of the formwork, they are in direct contact with the formwork. After
the vertical wall formwork panels are installed, they can be directly arranged vertically and in parallel at a certain distance
. It plays the role of template supporting skeleton. Since the profiled steel
contains wooden squares and has been processed by technology, regardless of the internal angle template joints
the top plate can still function as wooden squares (nails can be nailed at will). The secondary bar body
is drilled with a round hole that penetrates the bar body, so that the secondary bar can be connected to the
formwork through nails, which facilitates workers' individual operations and lifting requirements
during construction. The size is larger than that of wooden standard, and the strength is higher, which greatly improves the concrete forming quality
It fully meets the requirements of fair-faced concrete. In order to meet the versatility of the frame
column wall top, there are
eight kinds of sub-bar sizes. Any floor
Any size, no need to change the size. Truly versatile and modular
Customers are welcome to call us for consultation. Contact Manager Gao
Request for quotation
A total of0articles  Related Comments: